Prime Energy achieves first gas at Malampaya Phase 4 Philippines

Offshore Technology · Shree Mishra ·

Prime Energy has started producing gas from its Malampaya Phase 4 project offshore the Philippines, bringing output from two new wells into the existing production system.

Prime Energy has started producing gas from its Malampaya Phase 4 project offshore the Philippines, bringing output from two new wells into the existing production system.

The Malampaya East-1 and Camago-3 wells were connected to the field through subsea infrastructure installed under the project.

Discover B2B Marketing That Performs

Read the full story at Offshore Technology · All coverage of this story